Are solar farms the most popular electricity generation systems?
According to a recent survey, ground-mounted photovoltaic systems in particular receive high approval at 62% for the construction of solar parks as energy suppliers in the neighborhood. Nuclear power plants are far behind at 5% and coal-fired power plants are far behind at 4%.
Which power generation systems in your neighborhood do you find very good or rather good?
- 62% – solar park
- 60% – Renewable energy systems in general
- 47% – wind turbine
- 32% – biogas plant
- 22% – Electricity pylons of an overland power line
- 15% – gas power plant
- 5% – nuclear power plant
- 4% – coal-fired power plant
📣 Parking areas solar solutions for industry, retail and municipalities
Everything from a single source, specially designed for solar solutions for large parking areas. You refinance or counterfinance into the future with your own electricity generation.
🎯 For solar engineers, plumbers, electricians and roofers
Advice and planning including a non-binding cost estimate. We bring you together with strong photovoltaic partners.
👨🏻 👩🏻 👴🏻 👵🏻 For private households
We are positioned across regions in German-speaking countries. We have reliable partners who advise you and implement your wishes.
Outdoor photovoltaic system with or without government funding?
A solar park is an outdoor solar system that is not set up on a building or on a facade, but rather at ground level in an open area. A solar park is a permanently installed system in which the photovoltaic modules are aligned at an optimal angle to the sun (azimuth) using a substructure.
Ground-mounted photovoltaic systems can now also be built without government funding. These projects do not make use of the EEG levy ; they refinance themselves solely through their own consumption of electricity.
Through scale (production volume) and synergy effects, large solar fields reduce the cost of electricity generation to such an extent that EEG compensation is no longer necessary. The increasingly cheaper prices for solar modules have contributed to this.
outdoor photovoltaic systems were the most sought-after alternative compared to solar systems in businesses, at home or in industry.
What is the process for building a ground-mounted photovoltaic system?
Before construction begins, ground-mounted solar systems usually go through an approval process in the municipality. In order to be able to use an area, it must be changed to a “solar special area” land use plan development plan is also necessary that creates building rights in the relevant area. The land-use planning . It examines the spatial significance and environmental compatibility of the project and should involve all citizens and those responsible for public affairs. In addition to the size of the system, space consumption and technology, an important basis for decision-making is the green space plan . He describes how the planned open space facility will be integrated into the landscape and how it will be ecologically enhanced. After hearing from all parties involved, the municipality approves the development plan. The building permit is then issued.
What are the requirements for EEG funding?
The EEG in Germany only provides for the application of the remuneration rates for certain open spaces (§ 37, § 48 EEG 2017):
- Sealed surfaces . A seal is when the surface of the floor is sealed. Therefore, electricity from systems on roads, parking spaces, landfill areas, embankments, storage and parking areas and the like is also compensated.
- Conversion areas for commercial, traffic, residential or military use. Conversion areas can include, for example, waste dumps, former open-cast mining areas, military training areas and ammunition depots.
- Areas along motorways or railways at a distance of up to 110 meters.
- Arable land and grassland, only if they are located in a disadvantaged area in accordance with Directive 86/465/EEC and have been approved for PV use by the federal states.
The substructure of solar power plants usually only seals a fraction of the natural surface, often less than 0.05% of the actual ground area. The space between the individual rows, which is required to counteract shading of individual rows of modules when the sun is low, contributes to an improvement in ecological quality.
Lease or lease areas for outdoor solar systems?
The following minimum criteria should be met:
- The area is predominantly unshaded
- The area is available for at least 20 years
- There are no third party access rights
With Xpert.Solar we also offer consulting services for companies that are planning a photovoltaic system for a flat roof or pitched roof - even without roof penetration!
- Plan photovoltaics for warehouses, commercial halls and industrial halls
- Industrial plant: Plan a photovoltaic open-air system or open-space system
- Plan solar systems with photovoltaic solutions for freight forwarding and contract logistics
- B2B solar systems and photovoltaic solutions & advice
That's why Xpert.Solar for solar park advice, for photovoltaic ground-mounted systems or PV ground-mounted systems
I would be happy to serve as your personal advisor.
You can contact me by filling out the contact form below or simply call me on +49 89 89 674 804 (Munich) .
I'm looking forward to our joint project.
Xpert.Digital – Konrad Wolfenstein
Xpert.Digital is a hub for industry with a focus on digitalization, mechanical engineering, logistics/intralogistics and photovoltaics.
With our 360° business development solution, we support well-known companies from new business to after sales.
Market intelligence, smarketing, marketing automation, content development, PR, mail campaigns, personalized social media and lead nurturing are part of our digital tools.
You can find out more at: www.xpert.digital – www.xpert.solar – www.xpert.plus